The guide is developed to unify technical requirements for the construction of green corridor for railways,for the purpose of stabilizing slopes,conserving water and soil,improving environment,preventing disasters and landscaping.The guide is applicable to the design,construction,quality inspection and acceptance of green corridor for new railway project and railway reconstruction project.
作者簡介
暫缺《鐵路工程綠色通道建設(shè)指南(鐵總建設(shè)2013No.94 英文版)》作者簡介
圖書目錄
1 General Provisions 2 Terms 3 Basic Requirements 4 Subgrade Greening Design 4.1 General Requirements 4.2 Soil Embankment and Cutting 4.3 Stone Embankment and Cutting 4.4 Greening outside Embankment Toe or Cutting Top 5 Greening Design for Bridge Section and Tunnel Section 6 Greening Design for Station Area 7 Greening Design for Other Areas 8 Greening Construction 8.1 General Requirements 8.2 Construction Preparations 8.3 Nursing 8.4 Planting 8.5 Maintenance during Construction 9 Quality Inspection and Acceptance 9.1 GeneralRequirements 9.2 Protection by Plants and Greening 9.3 Auxiliary Facilities of Greening Engineering Appendix A Common Shrubs,Grasses,Vines and Arbors for Green Corridor Appendix B Shrub Regions and Highest Altitudes for Arbors Stipulated by the State Appendix C Planting Position of Arbors and Shrubs Explanation of Wording in this Guide