注冊 | 登錄讀書好,好讀書,讀好書!
讀書網(wǎng)-DuShu.com
當(dāng)前位置: 首頁出版圖書科學(xué)技術(shù)工業(yè)技術(shù)電工技術(shù)DL/T 507—2014 水輪發(fā)電機(jī)組啟動試驗(yàn)規(guī)程(英文版)

DL/T 507—2014 水輪發(fā)電機(jī)組啟動試驗(yàn)規(guī)程(英文版)

DL/T 507—2014 水輪發(fā)電機(jī)組啟動試驗(yàn)規(guī)程(英文版)

定 價(jià):¥27.00

作 者: 中國電力出版社
出版社: 中國電力出版社
叢編項(xiàng):
標(biāo) 簽: 暫缺

ISBN: 9787519843304 出版時(shí)間: 2020-04-01 包裝: 平裝
開本: 16開 頁數(shù): 26 字?jǐn)?shù):  

內(nèi)容簡介

  This standard is prepared in accordance with Notzjication on the development and revision plan of the secondbatch energy industrial standards in 2011 issued by National Energy Administration [GNKJ (2011)No.252].This standard is structured and organized in accordance with Standard GB/T 1.1-2009 Directives for standardization-Part 1: Structure and drafting of standards.The standard is a revision to standard DL/T 507-2002 Start-up test code for hydro-generating units (hereinafter referred to as the previous standard). Compared with the previous standard, the main technical changes include:——Revised the limit on run-out (peak-to-peak value) for unit operation.——Revised allowable values of horizontal and vertical vibration (peak-to-peak value) of turbine head cover with rated speed greater than 375 rpm to 750 rpm and allowable value of horizontal vibration (peak-to-peak value) of the frame at stator core, and added explanation on the characteristics of allowable values.——Explained in details the parameter adjustment test for service water supply; and explained in details the short-circuit test for station service transformer by means ofhydro-generating units.——Added test on injection-type ground protection of hydro-generating units.——Revised loading and load shedding test of hydro-generating units; and added test on thermal stability of hydro-generating units.——Clarified requirements for test on dynamic water closing service gate or inlet valve of turbine and test on closing ring gate ofhydro-generating units.——Added requirements on simultaneous'load shedding test of multiple generating units that share a single waterway.——Cancelled the requirement for 30-day comnussioning.

作者簡介

  本標(biāo)準(zhǔn)由中國電力企業(yè)聯(lián)合會提出。本標(biāo)準(zhǔn)由電力行業(yè)水輪發(fā)電機(jī)及電氣設(shè)備標(biāo)準(zhǔn)化技術(shù)委員會歸口。本標(biāo)準(zhǔn)起草單位:中國水利水電建設(shè)集團(tuán)公司、中國水利水電第八工程局有限公司。本標(biāo)準(zhǔn)主要起草人:付元初 王啟茂 李紅春謝學(xué)農(nóng) 姚正鴻孫永衛(wèi) 舒春雷

圖書目錄

Foreword
1 Scope
2 Normative References
3 General Provisions
4 Inspection before Start-up Test
5 Water Filling Test
6 Start-up and No-load Test
7 Test of Generator with Main Transformer and HV Switchgear
8 Synchronization and Loading Test
9 72h Continuous Test Run with Load
10 Handover and Putting into Commercial Operation
Appendix A (Informative) Recording Form for Load Shedding Test
Appendix B (Informative) List of Documents to be Handed over for Acceptance of Unit Start-up
Test Run
References

本目錄推薦

掃描二維碼
Copyright ? 讀書網(wǎng) ranfinancial.com 2005-2020, All Rights Reserved.
鄂ICP備15019699號 鄂公網(wǎng)安備 42010302001612號